6980 Côte Saint-Luc

6980 Côte Saint-Luc

For this project, RBA Construction completed the full replacement of a 30,000 sq ft interior parking membrane using the Sika system, as well as the replacement of the structural slab expansion joint with an Emseal product. These interventions ensured optimal waterproofing, protection against water infiltration, and long-term durability of the parking structure.